首页> 外文会议>Cigre session >EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS
【24h】

EXPERIENCES IN IDENTIFICATION OF PARTIAL DISCHARGE PATTERNS IN LARGE HYDROGENERATORS

机译:大型水轮发电机部分放电模式的识别经验

获取原文

摘要

In this paper some experiences on partial discharge (PD) pattern identification in hydrogenerators from 103 to 805 MVA at the Guri and Macagua II power stations in Venezuela are presented. Visual inspections and measurements were carried out for partial discharge pattern identification in several different generators. In addition to these results, simultaneous measurements of on-line partial discharges were performed with vibration measurements on the stator core and frame under different operating conditions. Ozone concentration was also evaluated. Since slot discharges are directly relates with movement in slots and to determine how load conditions would affect magnetic forces over stator bars and their movement on the slot, simulations by FEM were performed.
机译:本文介绍了委内瑞拉Guri和Macagua II电站从103 MVA到805 MVA的水轮发电机中局部放电(PD)模式识别的一些经验。进行了目视检查和测量,以识别几种不同发电机中的局部放电模式。除了这些结果外,还对在线局部放电进行了同时测量,同时对不同工作条件下的定子铁心和机架进行了振动测量。还评估了臭氧浓度。由于槽孔放电与槽孔运动直接相关,并确定负载条件如何影响定子条上的磁力及其在槽孔中的运动,因此进行了FEM仿真。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号