The world's first Gas Insulated Transmission Line (GIL) with N_2 and SF_6 gas mixture at a voltage level of 550 kV has been in operation in Bangkok, Thailand since January, 2002. The high current rating of 4000 A makes this GIL to one of the strongest high power transmission systems worldwide with 3800 MVA power carrying capability.The GIL is operated under severe ambient conditions with high sun radiation and high ambient temperatures, respectively. The high thermal requirements made it necessary to use accurate thermal calculations. This was facilitated with two different thermal calculation tools, using analytical and finite element methods. The results have been verified with measurements on prototypes and existing GILs in service.The Electricity Generating Authority of Thailand (EGAT) has built a gas-insulated 550 kVswitchgear in the Sai Noi substation 8 line feeders and 2 connection bays to the existing GIS.The decision was made for GIS technology in spite of AIS because land acquisition wasexpected to become difficult.The existing and the new GIS equipment are installed in the same building. The new 550 kVGIS, the existing GIS and the overhead lines are connected by GIL and by air insulatedbuses.The 2nd generation GIL design is optimised for on-site assembly which results in minimum installation times. The experiences gained with the on-site assembly, the gas handling and the high voltage testing were very positive and the works could be carried out in a shorter time frame than planned. In addition to the description of the project this article emphasises also on some physical advantages of GIL.
机译:自2002年1月起,世界上第一条电压为550 kV的N_2和SF_6混合气体的气体绝缘输电线路(GIL)在泰国曼谷投入运行。4000A的高额定电流使该GIL成为了其中的一种GIL具有3800 MVA的功率承载能力,是全球最强大的大功率传输系统。GIL分别在恶劣的环境条件下,高太阳辐射和高环境温度下运行。对热量的高要求使得必须使用精确的热量计算。使用分析和有限元方法的两种不同的热计算工具可以简化这一过程。泰国的发电局(EGAT)已在Sai Noi变电站内建立了一个气体绝缘的550 kV开关柜,其中8个线路馈线和2个与现有GIS的连接托架已被使用中的原型和现有GIL进行了测量验证了结果。尽管AIS仍然存在,但仍决定采用GIS技术,因为预计土地征用将变得困难。现有和新的GIS设备安装在同一建筑物中。新的550 kVGIS,现有GIS和架空线通过GIL和空气绝缘母线连接。第二代GIL设计针对现场组装进行了优化,从而缩短了安装时间。现场组装,气体处理和高压测试所获得的经验是非常积极的,并且可以在比计划的时间更短的时间内完成工作。除了对项目的描述之外,本文还重点介绍了GIL的某些物理优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号