Field Debugging of UHV AC Extension Project in China

机译:中国特高压交流扩建工程现场调试

获取原文
获取原文并翻译 | 示例

摘要

To make sure that the UHV AC extension project can be carried out successfully, a software for power system simulation is used to analyze system commissioning tests, including the switching test of the low-voltage reactive-load compensation equipment, the switching test of 1000kV no-load line with series capacitors, the switching test of series compensator, the artificial earth short circuit test etc. The simulation results are compared with the measured data in tests. Research results show that the simulation results are basically consistent with the field measured data. Moreover, the simulation calculation model, the calculation parameters, and the calculation tool can meet the demand of the engineering research. It provides the reliable technical basis for future analysis and control of the interconnected network operation.
机译:为了确保特高压交流扩建项目能够顺利进行,使用了用于电力系统仿真的软件来分析系统调试测试,包括低压无功负载补偿设备的开关测试,1000kV no的开关测试。带串联电容器的负载线,串联补偿器的开关测试,人为接地短路测试等。将仿真结果与测试中的测量数据进行比较。研究结果表明,仿真结果与现场实测数据基本吻合。此外,仿真计算模型,计算参数和计算工具可以满足工程研究的需求。它为将来分析和控制互连网络的运行提供了可靠的技术基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号