首页> 外文会议>Conference on Dynamics of Systems, Mechanisms and Machines >Determination of Electrical Quantities in the Traction Rail Network and Buried Pipelines Located Under the Influence of Stray Currents from Electrified Railway Transport
【24h】

Determination of Electrical Quantities in the Traction Rail Network and Buried Pipelines Located Under the Influence of Stray Currents from Electrified Railway Transport

机译:电气化铁路运输中的杂散电流影响下的牵引铁路网和地下管道中的电量确定

获取原文

摘要

The paper presents a system consisting of a traction rail network and two buried pipelines located under the influence of stray currents from electrified railway transport. Analytical expressions for the calculation of the distribution of electrical quantities in the two buried pipelines with their mutual influence were obtained. Expressions were obtained using Hartley integral transform. The program, allowing monitoring the changes of electrical quantities in traction rail network and two buried pipelines at the movement of locomotives on track section, was developed. Also the proposed program calculates and writes the potential of the buried pipeline relative to copper-sulfate reference electrode to the file, which allows estimating the need for corrosion protection from stray currents from electrified railway transport.
机译:本文提出了一个系统,该系统由牵引铁路网和位于电气化铁路运输产生的杂散电流影响下的两条地下管线组成。得出了两条埋藏管道中相互影响的电量分布的解析表达式。使用Hartley积分变换获得表达式。开发了该程序,该程序允许在机车在轨道部分运动时监视牵引铁路网络和两条地下管道中的电量变化。拟议的程序还可以计算埋管相对于硫酸铜参比电极的电位并将其写入文件中,从而可以估计需要对电气化铁路运输产生的杂散电流进行腐蚀防护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号