首页> 外文会议>Celebrating the megascale >MODIFICATIONS TO A SMELTER TO ACCOMMODATE RECYCLED MATERIALS
【24h】

MODIFICATIONS TO A SMELTER TO ACCOMMODATE RECYCLED MATERIALS

机译:修改冶炼厂以容纳回收材料

获取原文
获取原文并翻译 | 示例

摘要

The Columbus Processing Complex of the Stillwater Mining Company began operations at Columbus, Montana in 1990 based on electric furnace smelting treating a precious metals concentrate from the nearby Stillwater mine and mill. Since that time, the smelter plant has been expanded in stages in order to treat recycled materials in addition to the concentrate. This paper describes a number of changes made at the plant to effectively handle recycled materials.
机译:斯蒂尔沃特矿业公司的哥伦布加工中心于1990年在蒙大拿州哥伦布开始运营,其基础是电炉冶炼,处理来自附近斯蒂尔沃特矿山和工厂的贵金属精矿。从那时起,冶炼厂已分阶段扩建,以便除精矿外还处理回收材料。本文介绍了工厂为了有效处理回收材料而进行的许多更改。

著录项

  • 来源
    《Celebrating the megascale》|2014年|237-241|共5页
  • 会议地点 San Diego CA(US)
  • 作者单位

    Stillwater Mining Company 1321 Discovery Drive Billings, MT, 59102, USA;

    Stillwater Mining Company 1321 Discovery Drive Billings, MT, 59102, USA;

    Stillwater Mining Company 1321 Discovery Drive Billings, MT, 59102, USA;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Recycle; smelter; PGMs; Stillwater;

    机译:回收;冶炼厂PGM;死水;
  • 入库时间 2022-08-26 13:49:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号