Sediments contaminated with coal tar were present in a 488 meter (1,600-foot) reach of an urban waterway in Buffalo, New York. Remedial action involved damming and diverting the streamflow around the work area, excavating and stabilizing 15,290 cubic meters (20,000 cubic yards) of hot-spot sediments, placing 8,826 square meters (95,000 square feet) of geosynthetic clay liner (GCL) and sand/armor stone cap, installation and operation of two deep DNAPL recovery wells, restoring aquatic and terrestrial plants, and long-term site monitoring. Capping entailed placement of an impermeable GCL followed by 45 cm (18 inches) of sand, geofabric, and a minimum of 15 cm (6 inches) of armor stone. Scour modeling and design calculations were performed to determine the size of the armor stone and thickness of the sand layer to ensure the long-term physical stability of the cap. Diffusion modeling was done to ensure the long-term mitigation of contaminant migration. The GCL was a reinforced composite liner consisting of a layer of sodium bentonite between two geotextiles which are needlepunched together and laminated to a membrane liner of 0.10 millimeter (4 mil) polyethylene. Topsoil was placed over selected cap sections and then planted with aquatic and emergent species. The cap was completed in 1999. Annual monitoring of the physical condition of the cap has been conducted, including two underwater video surveys. No sheens or other evidence of cap failure have been observed during the past 6 years. No erosion or uplifting of the cap is evident to date. The banks and shallows throughout the capped area have complete vegetation coverage. Numerous fish and animal species have been observed in the area, such as turtles, ducks, crayfish, and beavers. The project has enabled esthetic and economic improvements to the local community, including a recreational pathway adjacent to the waterway which is part of the City of Buffalo Local Waterfront Revitalization Plan.
机译:纽约州布法罗市一条城市水路的488米(1600英尺)范围内存在受煤焦油污染的沉积物。补救措施包括在工作区周围阻止和分流水流,挖掘和稳定15290立方米(20,000立方码)的热点沉积物,放置8,826平方米(95,000平方英尺)的土工合成粘土衬里(GCL)和沙子/装甲石盖,安装和运行两个深部DNAPL回收井,恢复水生和陆地植物,并进行长期现场监测。封盖需要放置不可渗透的GCL,然后放置45厘米(18英寸)的沙子,土工布和至少15厘米(6英寸)的装甲石。进行冲刷建模和设计计算,以确定装甲石的大小和砂层的厚度,以确保盖的长期物理稳定性。进行扩散建模以确保长期减轻污染物迁移。 GCL是一种增强的复合衬里,由两个土工布之间的一层钠膨润土组成,该土工布被针刺在一起并层压到0.10毫米(4密耳)聚乙烯的膜衬里。将表土放在选定的帽盖部分上,然后种植水生和紧急物种。该帽于1999年完成。对帽的身体状况进行了年度监测,包括两次水下视频调查。在过去的6年中,没有观察到任何光泽或其他证明瓶盖失效的证据。迄今为止,还没有发现瓶盖被腐蚀或隆起。整个封顶区域的河岸和浅滩具有完整的植被覆盖。该地区已观察到许多鱼类和动物物种,例如海龟,鸭子,小龙虾和海狸。该项目使当地社区的审美和经济状况得到改善,包括毗邻水道的休闲小径,这是布法罗市地方滨水区振兴计划的一部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号