THE ASHLU HYDROELECTRIC PROJECT: A CASE STUDY OF A RUN-OF-RIVER HYDROELECTRIC PROJECT IN SOUTHWEST BC

机译:阿什鲁水电项目:以不列颠哥伦比亚省西南部的河道水电项目为例

获取原文
获取原文并翻译 | 示例

摘要

The Ashlu Hydroelectric Project is a run-of-river hydro scheme in southwest BC, Canada. The project is on Ashlu Creek, upstream of the confluence with the Squamish River. The project uses a head difference on Ashlu Creek from the intake to the powerhouse. The project straddles the "hanging valley" where the Ashlu enters the Squamish valley. The intake and powerhouse are at the upstream and downstream extremes of a steep-sided, narrow canyon. The powerhouse is tucked into the base of the steep valley but the intake is above the narrow section of the creek where the valley opens up.The intake structure consists of an earthfill/rockfill embankment, a spillway with an Obermeyer gate and a sluiceway/intake. The spillway and most of the intake are founded on bedrock but the embankment and the sluiceway are founded on alluvial sediments. To avoid excavating a trench down to bedrock or installing a pile cut-off wall, an upstream blanket was designed to control seepage. As there are no sources of low permeability soil at the site, a geomembrane was used for the impervious unit of the upstream blanket. To prevent seepage from lifting the geomembrane, the geomembrane joints are not sealed so that pressures can be relieved. Minor seepage through the overlaps of the geomembrane is not a serious concern. This is one of the first applications of this design.This paper presents the design and construction of the unique aspects of Ashlu Hydro Project with particular focus on the intake/spillway/embankment structure on Ashlu Creek.
机译:阿什鲁水电项目是加拿大不列颠哥伦比亚省西南部的一条河流上游水利计划。该项目位于与Squamish河汇合处上游的Ashlu Creek。该项目利用了Ashlu Creek从进水口到发电厂的水头差。该项目跨越了Ashlu进入Squamish山谷的“悬空山谷”。进气口和动力室位于陡峭的,狭窄的峡谷的上游和下游。动力室被塞进陡峭的山谷底部,但进水口位于小溪所在山谷的狭窄部分上方,进水结构由填土/堆石路堤,带Obermeyer闸的溢洪道和泄水闸/进水组成。溢洪道和大部分进水口都建在基岩上,而路堤和水闸道则建在冲积物上。为了避免在基岩上开挖沟渠或安装桩基防渗墙,设计了上游橡皮布来控制渗流。由于现场没有低渗透性土壤,因此土工膜被用作上游毯层的防渗单元。为了防止渗漏抬起土工膜,土工膜接头未密封,因此可以减轻压力。通过土工膜的重叠而引起的轻微渗漏不是严重的问题。这是该设计的首批应用之一。本文介绍了阿什鲁水电项目独特之处的设计和施工,特别侧重于阿什鲁河的进水口/溢洪道/路堤结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号