【24h】

Surveillance Improvements at a Large Canadian Dam

机译:大型加拿大水坝的监控改进

获取原文
获取原文并翻译 | 示例

摘要

Increased surveillance was put in place at BC Hydro's Bennett Dam, one of the largest dams in Canada, after two sinkholes were identified in the dam in mid 1996. This paper describes the surveillance and instrumentation improvements that started during the 1996/7 sinkhole rehabilitation program and are ongoing at the dam. Instruments and techniques put in place to improve monitoring will be described including systems for seepage monitoring, climate monitoring, datalogging and automating weirs and piezometers, water quality monitoring, displacement monitoring, video monitoring, thermal monitoring, inspections and inspection techniques and equipment and winterization of monitoring equipment. Techniques to improve the performance monitoring and instrument results checking will be detailed. The Surveillance Response Plan and Long Term Monitoring Plans developed for the dam will be described as well as their relationship to the ongoing surveillance.
机译:在1996年中期在大坝中发现了两个污水坑之后,BC Hydro的Bennett大坝(加拿大最大的水坝之一)得到了加强的监控。本文介绍了1996/7污水坑修复计划期间开始的监控和仪器改进并在大坝中进行。将介绍为改善监测而采用的仪器和技术,包括用于渗漏监测,气候监测,数据记录和堰堰和压强计自动化,水质监测,位移监测,视频监测,热力监测,检查和检查技术和设备以及防冻的系统。监控设备。将详细介绍改善性能监控和仪器结果检查的技术。将描述为大坝制定的《监视响应计划》和《长期监视计划》及其与正在进行的监视的关系。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号