Belmont Island was a man-made oil drilling and production island located approxi-mately 8,100 feet offshore of the City of Seal Beach, California in about 42 feet of water. The island was located on State Oil and Gas Lease PRC 186, which contained approximately 1,225 acres of tide and submerged lands located within the Belmont Offshore Field in Orange County, California. During the 40-year active life of the Is-land, the wells produced approximately 28 million barrels of oil and 24 million cubic feet of natural gas. The State received over $40 million revenue and the operations grossed over $240 million. ExxonMobil terminated oil and gas production in 1994 due to declining production rates. This fixture in the waters off Seal Beach, survived nearly fifty years as the State's first offshore oil production facility, Belmont Island became the first man-made oil production island removed from the ocean waters off the California shoreline. After a nearly five year permitting process, the physical removal required 21 months, and was completed in January 2002 with no reportable accidents and no environmental incidents. All of the Island's components were completely removed except for components buried below the natural seafloor. The Belmont Island project provides a snapshot of the key issues and technical challenges facing decommissioning projects in today's regulatory climate. Such challenges included the handling of hydrocarbon contamination materials in the caisson core, cutting and removal of lead painted concrete and steel surfaces, and the logistical challenges of handling island materials on a gradually smaller work surface. This paper will provide an overview of these challenges and the approaches developed by the project team to address these challenges.
机译:贝尔蒙特岛(Belmont Island)是一个人造石油钻井和生产岛,位于加利福尼亚州锡尔比奇市(City Beach)约8100英尺的海上,约42英尺的水域。该岛位于国家石油和天然气租赁PRC 186上,其中包含约1,225英亩的潮汐和淹没土地,位于加利福尼亚州奥兰治县的贝尔蒙特近海油田内。在该岛的40年活跃期内,这些油井生产了大约2800万桶石油和2400万立方英尺天然气。纽约州获得了超过4000万美元的收入,业务总收入超过2.4亿美元。由于生产率下降,埃克森美孚于1994年终止了油气生产。这个密封装置位于海豹滩(Seal Beach)附近的水域中,作为该州第一个海上石油生产设施幸存了将近五十年,贝尔蒙特岛(Belmont Island)成为第一个从加利福尼亚海岸线外的海水中移出的人造石油生产岛。经过将近五年的许可程序,实际搬迁需要21个月,并于2002年1月完成,没有可报告的事故和环境事件。除了埋在天然海底之下的组件以外,岛上的所有组件均被完全移除。贝尔蒙特岛项目概述了当今法规环境下退役项目面临的关键问题和技术挑战。这些挑战包括处理沉箱核心中的碳氢化合物污染材料,切割和去除涂有铅的混凝土和钢表面,以及在逐渐减小的工作表面上处理岛状材料的后勤挑战。本文将概述这些挑战以及项目团队为应对这些挑战而开发的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号