首页> 外文会议>BGA International Conference on Foundations; 20030902-0502; Dundee(GB) >Design and performance of a large diameter shaft in Dublin Boulder Clay
【24h】

Design and performance of a large diameter shaft in Dublin Boulder Clay

机译:都柏林巨石粘土中大直径竖井的设计与性能

获取原文
获取原文并翻译 | 示例

摘要

Small wall deflections of less than 10mm were mobilised during the construction of a 56.6m diameter 28m deep circular TBM launch and reception shaft for the Dublin Port Tunnel Project. A series of FE analyses were performed to predict wall behaviour during deep excavation. Initial shaft behaviour involved cantilever deflection of individual diaphragm wall panels as initial inter-panel gaps closed and a small hoop stiffness was mobilised by the cylindrical shaft structure. Subsequent excavation phases involved bulging of the mid and lower portions of the shaft as a higher hoop stiffness is mobilised by the structure and small rotations occur about the mid level ring beam. Small creep and consolidation related movements, no more than about 3mm, occurred during pause periods.
机译:在为都柏林港口隧道项目建造直径56.6m,深28m的圆形TBM发射和接收竖井期间,动员了小于10mm的小壁挠度。进行了一系列有限元分析,以预测深基坑开挖期间的墙体行为。初始的轴行为涉及到各个膜片墙面板的悬臂挠曲,因为初始的面板间间隙闭合并且圆柱轴结构动员了较小的箍刚度。随后的开挖阶段涉及到竖井中部和下部的鼓胀,因为该结构动员了更高的环向刚度,并且围绕中水准环梁发生了很小的旋转。在暂停期间,发生了与蠕变和固结相关的较小移动,不超过3mm。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号