首页> 外文会议>Autonomic and Autonomous Systems, 2009. ICAS '09 >A Method for Multi-project with Resource Constraints Based on Greedy Strategy
【24h】

A Method for Multi-project with Resource Constraints Based on Greedy Strategy

机译:一种基于贪婪策略的资源受限多项目方法

获取原文

摘要

Resource conflict is an outstanding problem in concurrent multiple projects with sharing a common and limited resource pool, and it often results in lower performance of these projects. Therefore, it is important and urgent to find an effective method for scheduling multiple projects with limited resources. A mathematical model for the multi-project scheduling problem with resource-constrained is proposed, and a scheduling algorithm based on greedy strategy for the problem is analyzed. Its application in real projects and comparison with other scheduling schemes proves that the algorithm is feasible.
机译:资源冲突是在并发多个项目中共享公共资源库的一个突出问题,并且资源冲突通常会导致这些项目的性能降低。因此,找到一种有效的方法来调度资源有限的多个项目是重要且紧迫的。提出了一种资源受限的多项目调度问题的数学模型,并分析了基于贪婪策略的调度问题。该算法在实际工程中的应用以及与其他调度方案的比较证明了该算法的可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号