Case Study Of An Alternative Solution To A High-Energy Drain Problem In A Surface Condenser

机译:表面冷凝器中高能排放问题的替代解决方案的案例研究

获取原文
获取原文并翻译 | 示例

摘要

During the startup of an early vintage steam turbine-generator unit (prior to engineered steam bypass systems), warming of the steam piping is commonly achieved through numerous small-bore steam line drains that "dump" into the main surface condenser. And in some cases, it is not unusual for these drains to be open till well beyond the point at which full throttle pressure and temperature are achieved at the turbine resulting in high-energy superheated steam flowing at sonic velocities. And most condensers built earlier than 1980 were ill equipped to handle these high-energy drains without damage. Midwest Generation's Collins Station, like many others, was built before the EPRI guidelines for high-energy drains were written. Consequently, the initial condenser, provided by Southwestern Engineering, did not adequately address these drains. But unlike most other stations, Collins was operated from the beginning as a cycling station, i.e. 50 - 100 startups per year. Consequently, their condensers have had a significant portion of their operating lives devoted to startup situations with these drains in operation. As a result, the condensers began exhibiting wall distortion and thermal fatigue cracks less than a year into their service life. The station spent the next 25 years repairing, patching, and trying modifications, all without lasting success. In the Fall of 2002, they asked Raymond Professional Group to study the situation and formulate a cost-effective permanent repair.
机译:在早期的老式蒸汽涡轮发电机组(工程蒸汽旁路系统之前)启动期间,通常通过大量“排入”主表面冷凝器的小口径蒸汽管线排放口来实现蒸汽管道的加热。在某些情况下,打开这些排污口的情况并不罕见,直到远远超过涡轮机达到完全节流压力和温度的点,从而导致高能过热蒸汽以音速流动。而且,大多数早于1980年建造的冷凝器都没有配备足够的设备来处理这些高能排放口而没有受到损坏。与许多其他项目一样,中西部世代的Collins站是在撰写EPRI高能排放指南之前建立的。因此,西南工程公司提供的最初的冷凝器无法充分解决这些排水问题。但是与大多数其他站点不同,柯林斯从一开始就作为自行车站点运营,即每年50至100家初创公司。因此,冷凝器的使用寿命中有很大一部分专门用于启动这些排水管的启动情况。结果,冷凝器在使用寿命不到一年的时间内就开始出现壁变形和热疲劳裂纹。该站在接下来的25年中花费了很多时间进行维修,打补丁和尝试修改,但都没有持久的成功。在2002年秋天,他们要求雷蒙德专业小组研究情况并制定具有成本效益的永久性维修。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号