【24h】

DRY AND HYBRID CONDENSER COOLING DESIGN TO MAXIMIZE OPERATING INCOME

机译:干式和混合式冷凝器冷却设计,可最大限度地提高运营收入

获取原文
获取原文并翻译 | 示例

摘要

Reduced availability of the large quantities of water required for traditional wet condenser cooling systems has created a growing market for dry and hybrid cooling for power plants. These technologies significantly reduce overall water consumption, but with large capital cost and heat rate penalties. An important consideration in sizing air-cooled and hybrid condensing systems is the emergence of a spot market for electrical energy. Energy prices can vary over an order of magnitude, and are typically highest during summer conditions. This paper evaluates whether it may be more economical to over-size the cooling system to achieve lower backpressures during the summer and thus generate additional revenue when energy prices peak. A universal methodology for evaluating the impact of cooling system design on operating economics was developed. It consists of a capital cost database for the condensing system, a Gate/Cycle model used to evaluate the effect of cooling parameter selection thermal performance, climatological data to provide representative dry bulb and wet bulb temperatures for typical annualized operating profiles at each plant location, and historical spot market energy pricing for each plant location. Several different design points for the cooling system are examined to determine the optimum selection that maximizes the difference between revenue and cooling system capital cost recovery. A nominal 500 MW coal-burning power plant is used as the study basis to demonstrate the results of this methodology for both northeastern and southwestern sites in the USA.
机译:传统湿式冷凝器冷却系统所需的大量水供应减少,为发电厂的干式和混合式冷却创造了一个增长的市场。这些技术可显着减少总体用水量,但会产生大量的资本成本和热费率罚款。在确定风冷和混合冷凝系统的尺寸时,一个重要的考虑因素是出现了电能现货市场。能源价格可能会变化一个数量级,通常在夏季情况下最高。本文评估了加大冷却系统的尺寸以在夏季实现较低的背压并因此在能源价格达到峰值时产生额外的收入是否更经济。开发了评估冷却系统设计对运行经济性影响的通用方法。它包括冷凝系统的资本成本数据库,用于评估冷却参数选择热性能的影响的Gate / Cycle模型,气候数据,以提供代表性的干球和湿球温度,用于每个工厂位置的典型年度运行曲线,以及每个工厂位置的历史现货市场能源价格。检查冷却系统的几个不同设计点,以确定最佳选择,以使收益与冷却系统资本成本回收之间的差异最大。标称的500兆瓦燃煤电厂被用作研究基础,以证明该方法在美国东北部和西南部站点的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号