首页> 外文会议>ASME international pipeline conference 2008 >SCC INTEGRITY MANAGEMENT FOR A GAS PIPELINE USING A COMBINED APPROACH EW ILI, CALIBRATION EXCAVATION AND FAD ANALYSIS
【24h】

SCC INTEGRITY MANAGEMENT FOR A GAS PIPELINE USING A COMBINED APPROACH EW ILI, CALIBRATION EXCAVATION AND FAD ANALYSIS

机译:结合方法EW ILI,标定挖掘和FAD分析的天然气管道SCC完整性管理

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Gas pipeline operators face significant challenges with respect to quantifying and managing SCC in gas pipelines. Following SCCDA excavations, SCC was found on one of TCPL's gas pipelines. A combined approach was then introduced to manage SCC, which consists of comparison of two consecutive Elastic Wave Inspection Runs prioritization of excavations, refinement of ILI tool sizing performance, and remediation using a Fracture Mechanics based FAD (Failure Assessment Diagram) methodology. The overall process from the ILI inspections to crack growth comparison, as well as integrity assessment and rehabilitation has demonstrated the effectiveness of the approach for SCC integrity management.rnIn this paper, the history of the subjected pipeline segment is described. The concept of the approach is presented. The process of applying the approach to manage the pipeline integrity is outlined with examples for demonstration. The potential of utilizing this approach and process to other pipelines and crack detection ILI tools in gas pipelines in terms of POI, sizing, and excavation is discussed.
机译:天然气管道运营商在量化和管理天然气管道中的SCC方面面临重大挑战。在进行SCCDA挖掘之后,在TCPL的一条天然气管道中发现了SCC。然后,引入了一种组合方法来管理SCC,该方法包括比较两个连续的弹性波检查运行的开挖优先级,改进ILI工具的尺寸确定性能以及使用基于断裂力学的FAD(故障评估图)方法进行补救。从ILI检查到裂纹扩展比较以及完整性评估和修复的整个过程证明了SCC完整性管理方法的有效性。在本文中,将描述受管段的历史。介绍了该方法的概念。通过示例概述了应用该方法管理管道完整性的过程。讨论了在POI,尺寸和开挖方面将这种方法和方法应用于天然气管道中的其他管道和裂缝检测ILI工具的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号