首页> 外文会议>ASME(American Society of Mechanical Engineers) Turbo Expo vol.2; 20070514-17; Montreal(CA) >OPERATING EXPERIENCE OF HIGH FLEXIBILITY SYNGAS BURNER FOR IGCC POWER PLANT
【24h】

OPERATING EXPERIENCE OF HIGH FLEXIBILITY SYNGAS BURNER FOR IGCC POWER PLANT

机译:IGCC电厂高灵活性SYNGAS燃烧器的运行经验

获取原文
获取原文并翻译 | 示例

摘要

Ansaldo Energia Low BTU engines have been accumulating more than 150000 EOH (Equivalent Operating Hours) burning low Btu Fuels on two different projects such as Isab Priolo and Elettra Servola. More over a new unit Ferrera Erbognone 3 has started to be commissioned in March 2006 burning syngas from tar gasification. This latter will be the first real commercial power plant in Italy to be operated without taking into account the high benefits once available according to the national law (CIP6/1992) specifically dealing with recovery fuel usage (alternative to natural gas). The end of the first phase of commissioning of Ferrera Erbognone 3 will give the opportunity to present the results achieved and to validate the burner design process for this specific power plant. In the IGCC gasifier island of Ferrera 3 power plant, it will be possible to separate hydrogen in variable quantity from the syngas according to the demands of the refinery located nearby the power plant, thus giving a high composition variability as output fuel. Also, if the maximum quantity of hydrogen will be separated, an integration with natural gas will be performed in order to get the maximum power output of the power plant. As a consequence, the syngas burner has been designed taking into account all the fuel characteristics depending on the different composition carried out. According to these, the burner has been optimised in order to fit the various syngas blends to be fuelled when running the engine. The paper describes the experience achieved during the commissioning activity prior to the commercial operation started in September 2006 highlighting the main results achieved with respect to the plant requirement. Furthermore a description of the functional improvement of the engine in order to face the unexpected off design conditions will be reported.
机译:Ansaldo Energia低BTU发动机在两个不同的项目(例如Isab Priolo和Elettra Servola)上累积了超过150000 EOH(等效运行时间)燃烧低Btu燃料。 Ferrera Erbognone 3的新装置已于2006年3月开始投产,燃烧焦油气化生产的合成气。后者将成为意大利第一家真正的商业发电厂,无需考虑根据国家法律(CIP6 / 1992)一旦可获得的高收益,即专门针对回收燃料的使用(替代天然气)。 Ferrera Erbognone 3调试的第一阶段结束后,将有机会介绍所取得的成果并验证该特定电厂的燃烧器设计过程。在费雷拉3号电厂的IGCC气化炉岛中,将有可能根据位于电厂附近的精炼厂的需求从合成气中分离出数量可变的氢气,从而使输出燃料具有较高的成分可变性。另外,如果将分离出最大量的氢气,则将与天然气进行整合,以获得发电厂的最大功率输出。因此,合成气燃烧器的设计考虑了所有燃料的特性,取决于所执行的不同组成。据此,燃烧器已经进行了优化,以适合在运行发动机时要加油的各种合成气混合物。本文介绍了在2006年9月开始商业运营之前的调试活动中获得的经验,重点介绍了在工厂需求方面取得的主要成果。此外,将报告对发动机的功能改进以应对意外的非设计条件的描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号