The IGCC power plant of Ferrera Erbognone will be the first real commercial power plant in Italy to be operated without taking into account the high benefits once available according to the national law (CIP6/1992) specifically dealing with recovery fuel usage alternative to natural gas. The syngas will be provided by the nearby refinery using tar as main feedstock. Furthermore, according to the demands of the refinery it will be possible in the gasifier island to separate hydrogen in variable quantity from the syngas thus giving a high variability composition as output fuel. Also, if the maximum quantity of hydrogen will be separated, an integration with natural gas will be performed in order to get the maximum power output of the power plant. As a consequence, the syngas burner has been designed taking into account all the fuel characteristics depending on the different composition carried out. According to these, the burner has been optimised in order to fit the various syngas blends to be fuelled when running the engine. In order to verify the modifications carried out the burner has been tested both at atmospheric and full engine conditions since the NOx requirements for this project are the more stringent experienced with respect to the past projects (NOx to be below 25 ppm). During these test the main aspect to be investigated have been: a) Minimum load when feeding the gas turbine with syngas b) NOx emission from 60% load up to base load c) Change over from natural gas to syngas and vice versa. The tests have been performed successfully: commissioning on site will start on November 2005. The paper describe the design and the testing phase highlighting the main features of the burner and the fuel system with respect to the plant requirements.
机译:费雷拉·埃尔博格诺内(Ferrera Erbognone)的IGCC发电厂将是意大利运营的第一座真正的商业发电厂,而不会考虑到根据国家法律(CIP6 / 1992)获得的高收益,特别是涉及替代天然气的回收燃料使用。合成气将由附近的炼油厂提供,以焦油为主要原料。此外,根据精炼厂的需求,将有可能在气化器岛中从合成气中分离出可变量的氢,从而提供了高可变性的成分作为输出燃料。另外,如果将分离出最大量的氢气,则将与天然气进行整合,以获得发电厂的最大功率输出。因此,合成气燃烧器的设计考虑了所有燃料的特性,取决于所执行的不同组成。据此,燃烧器已经进行了优化,以适合在运行发动机时要加油的各种合成气混合物。为了验证所做的修改,燃烧器已经在大气和全引擎条件下进行了测试,因为该项目的NOx要求相对于过去的项目更为严格(NOx低于25 ppm)。在这些测试过程中,要研究的主要方面是:a)向燃气轮机供应合成气时的最小负载b)从60%负载到基本负载的NOx排放c)从天然气转换为合成气,反之亦然。测试已成功完成:将于2005年11月开始现场调试。本文介绍了设计和测试阶段,着重说明了燃烧器和燃油系统相对于工厂要求的主要特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号