【24h】

CHALLENGES FACING PERFORMANCE EVALUATIONS OF IGCC POWER PLANTS

机译:IGCC电厂的性能评估面临的挑战

获取原文
获取原文并翻译 | 示例

摘要

Based on the present revival of coal as the fossil fuel of choice for power generation, there is a high probability that several IGCC projects will materialize in the near future. One of the challenges facing the Owners, EPC Contractors and OEM's will be to define the performance commercial guarantees and the practical means to determine them. In addition following the current huge upturn in conventional supercritical coal fired power plants, a large number of facilities will conduct thermal performance tests. The proper conductance of the test, data collection and correction to reference conditions, have many technical implications and could affect drastically the commercial outcome of a project both for the Contractor and the Owner. For IGCC plants, in anticipation of this probability, ASME Performance Test Committee had developed a Performance Test Code for such type of plant - PTC 47, which was published in January 2007. In the first part, the paper will provide details about the specific challenges facing the implementation of the Code, in particular the proposed use of the input/output method (mass and energy balance). The presentation will cover other highlights of the code recommendations.The methodology is fully applicable to conventional power plants, since they use same type of fuel. The determination of the heat input based on actual continuous measurement of the mass flow and composition of the coal will be discussed in details. The practicality and the measurement uncertainty associated with fuel composition will also be analyzed. A comparison with the indirect method for determination of the heat input will also be presented. The article will evaluate how the code requirements are reflected in the definition of the power plant design, configuration and instrumentation. The implications of test tolerance as a commercial issue and measurement uncertainty as a technical issue will also be presented and evaluated Other unique aspects of the entire IGCC plant performance testing will be discussed: (1) stability criteria related to the gasification and integration processes, (2) corrections fromtest to guarantees conditions due to complex chemical, mechanical processes.Finally, the article will indicate the progress on the development of performance evaluation methodologies for other main IGCC components: gasifier, air separation unit, gas cleaning systems and Power Island.
机译:根据目前作为发电首选矿物的煤炭的复兴,很可能在不久的将来实现多个IGCC项目。业主,EPC承包商和原始设备制造商所面临的挑战之一将是定义履约商业担保以及确定担保的实际方法。另外,在当前常规超临界燃煤电厂出现巨大增长之后,大量设施将进行热性能测试。测试的正确进行,数据收集和对参考条件的校正具有许多技术含义,并且可能严重影响承包商和所有者的项目商业成果。对于IGCC工厂,ASME性能测试委员会已针对这种类型的设备制定了性能测试规范PTC 47,该规范于2007年1月发布。在第一部分中,本文将提供有关具体挑战的详细信息面对《守则》的实施,特别是提议的输入/输出方法(质量和能量平衡)的使用。该演讲将涵盖规范建议的其他重点内容。该方法完全适用于常规发电厂,因为它们使用的是相同类型的燃料。将详细讨论基于实际连续测量煤的质量流量和成分确定热量的方法。还将分析与燃料成分相关的实用性和测量不确定性。还将与用于确定热量输入的间接方法进行比较。本文将评估在电厂设计,配置和仪表的定义中如何反映代码要求。还将介绍和评估测试容忍度作为商业问题以及测量不确定度作为技术问题的含义,并将讨论整个IGCC工厂性能测试的其他独特方面:(1)与气化和集成过程相关的稳定性标准,( 2)从测试到由于复杂的化学,机械过程而导致的保证条件的校正。最后,本文将指出其他主要IGCC组件(气化炉,空气分离装置,气体清洁系统和Power Island)性能评估方法的开发进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号