【24h】

120 MW BOILER REHEAT TUBE LEAKAGE'S ANALYSIS AND REMEDIES

机译:120 MW锅炉再热管泄漏的分析及解决办法

获取原文
获取原文并翻译 | 示例

摘要

At Koradi Thermal Power Station we are having four boilers of 120MW capacity each supplied by M/S A.C.C. Bobcock Company. The frequent tube leakages were observed in boiler due to which ther was a tremendous generation loss of power and revenue on it. The frquent tube leakages in the outlet reheater zones since 1991 were referred to Metallurgy engg. Department of Indian Institute of Technology, Powai. The present paper highlights the causes of reheat tube failures and preventive measures to be taken by both operation and Maintenance staff.
机译:在Koradi热电厂,我们有4个120兆瓦容量的锅炉,每个锅炉由M / S A.C.C提供。 Bobcock公司。在锅炉中观察到频繁的管道泄漏,由于这导致发电和收益的巨大发电损失。自1991年以来,出口再热器区域中频繁发生的管泄漏被称为冶金学。珀瓦伊印度技术学院系。本文重点介绍了再热管故障的原因以及操作和维护人员应采取的预防措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号