首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference;APPEEC >PSCAD-Based Impact Study on Yindong HVDC Transmission System of Shandong Power Grid Faults
【24h】

PSCAD-Based Impact Study on Yindong HVDC Transmission System of Shandong Power Grid Faults

机译:基于PSCAD的山东电网银洞高压直流输电系统故障影响研究

获取原文

摘要

The PSCAD simulation model of Yindong HVDC system is established based on the actual parameters. Establish AC equivalent (Shandong power grid) model of inverter side using a suitable method for electromagnetic transient simulation, set up different types of faults to Shandong power grid, including unbalanced fault (ground fault) and symmetric faults (three-phase short-circuit fault), research and analysis on the impacts on Yindong DC transmission system of Shandong Power AC system faults, and it will provide some guidance for the stable operation of Yindong HVDC system.
机译:根据实际参数建立了银洞高压直流输电系统的PSCAD仿真模型。采用合适的电磁暂态仿真方法,建立逆变器侧的交流等效(山东电网)模型,建立山东电网不同类型的故障,包括不平衡故障(接地故障)和对称故障(三相短路故障) ),对山东电力交流系统故障对银洞直流输电系统的影响进行研究和分析,为银洞直流输电系统的稳定运行提供一些指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号