In this study, we propose a technique to include production data asd a part of the constraint in a reservoir description process. Based on the simulation studies, we observed that, during secondary recovery performance, the production parameters such as water breakthrough are closely tied to the connectivity between injectors and producers. Using this relationship, we introduce a method which allows incorporation of production data as a part of the constraint through an equivalent static parameter. For the purpose of incorporating this information, we use the method of simulated annealing.
展开▼