【24h】

FINE COAL RECOVERY PLANT INSTALLATION: SMITH BRANCH IMPOUNDMENT - PINNACLE MINING

机译:精煤回收厂的安装:史密斯分公司-品尼高采矿

获取原文
获取原文并翻译 | 示例

摘要

The sampling and analysis of the Smith Branch Impoundment and the thickener underflow from the Pinnacle preparation plant indicated the economic viability to install a fine coal recovery system at this site. The recovery system has been designed to utilize the latest fine coal technologies available to the industry. The system will incorporate the following advanced technologies; 400HP hydraulic electric dredge, compound spirals, deslime cyclone circuit, column flotation, dewatering chemicals and technologies and paste thickener.
机译:对Pinnacle选煤厂的Smith分支蓄水场和增稠器底流进行的采样和分析表明,在该地点安装细煤回收系统具有经济可行性。回收系统旨在利用行业可用的最新细煤技术。该系统将采用以下先进技术; 400HP液压电动挖泥机,复合螺旋泵,除泥旋流器回路,浮选柱,脱水化学品和技术以及糊状增稠剂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号