首页> 外文会议>Annual conference amp; exhibition of the American Wind Energy Association >Integrating wind turbines into the orcas island distribution system: study results
【24h】

Integrating wind turbines into the orcas island distribution system: study results

机译:将风力涡轮机整合到逆戟鲸岛屿分发系统中:研究结果

获取原文
获取原文并翻译 | 示例

摘要

This pape summarizes the results of a study that investigates the use of wind turbines to defer Orcas Power and Light Company (OPALCO) 25-kV distribution circuit upgrades. In this study wind data have been collected for two years through 1995-1996 and 1996-1997 winter peak seasons at the Mt. Constitution site, and compared with the results of a previous one year study to establish wind speed correlation with projected extreme peak load conditions. In addition, example high-resolution one-minute and ten-minute wind speed data were also gathered and analyzed to determine potential voltage fluctuations resulting from variations in wind farm output on the OPALCO distribution system. The results of this work indicate that adding a MW-scale wind farm at Mt. Constitution is a feasible alternative to upgrading the 25 kV Lopez-Eastsound circuit to 69 kV in 2000.
机译:本白皮书总结了一项研究的结果,该研究调查了使用风力涡轮机推迟Orcas电力和照明公司(OPALCO)25 kV配电线路升级的过程。在这项研究中,收集了1995年至1996年和1996年至1997年山顶冬季高峰期的两年的风数据。构造地点,并与上一年的研究结果进行比较,以建立风速与预计的极端峰值负荷条件的相关性。此外,还收集并分析了示例高分辨率一分钟和十分钟风速数据,以确定由OPALCO配电系统上的风电场输出变化引起的潜在电压波动。这项工作的结果表明,在山峰增加了一个兆瓦级的风电场。在2000年将25 kV Lopez-Eastsound电路升级到69 kV时,宪法是可行的替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号