首页> 外文会议>Annual conference and exhibition of the American Wind Energy Association >DOE-Epri Distributed Wind turbine Verification Program (TVP III)
【24h】

DOE-Epri Distributed Wind turbine Verification Program (TVP III)

机译:DOE-Epri分布式风力涡轮机验证计划(TVP III)

获取原文
获取原文并翻译 | 示例

摘要

In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Wermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation usign smaller "clusters" of wind turbines connected directly to the electricity distribution system. This paper presents and overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.
机译:1992年,电力研究所(EPRI)和美国能源部(DOE)发起了公用事业风力涡轮机验证计划(TVP)。该计划的目标是在美国电力公司开发的多个地点评估先进风力涡轮机的原型。在TVP计划下,德克萨斯州戴维斯堡的中西部服务和西南服务公司以及Wermont的Searsburg的Green Mountain Power Corporation已安装了两个六个兆瓦的风能项目。 1997年初,DOE和EPRI选择了另外五个公用事业项目,以评估与直接连接到配电系统的较小型风机“集群”中的分布式风力发电。本文介绍并概述了EPRI-DOE TVP计划以及现有和计划中的TVP项目的目标,范围和状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号