首页> 外文会议>Geotechnical and seismic research and practices for sustainability >leismic Stability Analyses on Elderberry Forebay Dam
【24h】

leismic Stability Analyses on Elderberry Forebay Dam

机译:接骨木浆果前湾大坝的地震稳定性分析

获取原文
获取原文并翻译 | 示例

摘要

Elderberry Forebay Dam is a zoned earthfill embankment dam. This paper presents results of seismic stability analyses on the dam using the recently developed design response spectrum. In the analyses, the Bray-Travasarou method was used to estimate earthquake-induced embankment slope displacements. For comparison purpose, earthquake-induced embankment slope displacements were also calculated with the Makdisi-Seed method. To represent the dynamic resistance of the dam, the yield accelerations determined from the pseudo-static analyses were used. The results of the analyses indicate that the dam is expected to deform under the maximum credible earthquake. The estimated earthquake-induced displacement for the most critical full reservoir condition is approximately 13.34 to 49.57 cm (0.44 to 1.63 ft). The sliding displacement may result in minor settlement and cracking of the crest and in surface raveling of the embankment slopes, but are not expected to compromise the integrity of the dam. The displacements are not expected to adversely affect the outlet conduit. The dam is likely to survive the potential earthquakes with only minor damage, and thus does not pose a significant safety hazard.
机译:接骨木前海湾大坝是一个分区的填土路堤大坝。本文介绍了使用最近开发的设计响应谱对大坝进行地震稳定性分析的结果。在分析中,使用Bray-Travasarou方法估算地震引起的路堤边坡位移。为了进行比较,还使用Makdisi-Seed方法计算了地震引起的路堤边坡位移。为了表示大坝的动态阻力,使用了根据拟静力分析确定的屈服加速度。分析结果表明,预计该大坝将在最大可信地震下发生变形。在最关键的全储层条件下,地震引起的位移估计约为13.34至49.57厘米(0.44至1.63英尺)。滑动位移可能会导致波峰的轻微沉降和开裂,以及路堤斜坡的表面倾斜,但不会影响大坝的完整性。预计位移不会对出口导管产生不利影响。该水坝很可能仅遭受很小的破坏就可以承受潜在的地震,因此不会造成重大的安全隐患。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号