首页> 外文会议>Ammonia plant safety amp; related facilities >Major challenges experienced aftercommissioning of the mega OMIFCOcomplex
【24h】

Major challenges experienced aftercommissioning of the mega OMIFCOcomplex

机译:大型OMIFCO复合体投入使用后遇到的主要挑战

获取原文
获取原文并翻译 | 示例

摘要

After successful commissioning of the OMIFCO complex in April-2005, teething troubles werernsurfacing in different forms that had to be dealt with both in the short term and long term forrncontinuous operation of the plants. Meticulous Root Cause Analysis of the problems by the OMIFCOrnengineers, vendor and the consultants and implementation of the corrective measures in the shortestrnpossible time was necessary to ensure safe and reliable operation of the complex.rnThis paper highlights the two major challenges faced by OMIFCO after commissioning of the plants:rnthe failure of the fresh cooling water system piping Y-joint on the pump discharge header and failurernof the Synthesis gas compressor turbine inlet pipe high pressure steam strainer. These major failuresrncaused significant loss of on stream days and productivity.
机译:在OMIFCO工厂于2005年4月成功调试后,出现了各种形式的初期麻烦,必须在工厂的短期和长期连续不间断运行中进行处理。 OMIFCO的工程师,供应商和顾问对问题进行细致的根本原因分析,并在最短的时间内采取纠正措施,以确保该综合设施的安全可靠运行。设备:泵排放集管上的新鲜冷却水系统管道Y型接头发生故障,以及合成气压缩机涡轮进气管高压蒸汽过滤器故障。这些重大故障导致生产日和生产率的重大损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号