首页> 外文会议>Ammonia plant safety amp; related facilities >Lesson Learned during First Years of Operation of CaMau Ammonia Plant
【24h】

Lesson Learned during First Years of Operation of CaMau Ammonia Plant

机译:CaMau氨厂投产第一年的经验教训

获取原文
获取原文并翻译 | 示例

摘要

Despite the fact that the plant was able to reach design capacity, it was operating at conditions deviating from design in a number of places during the first years of operation. As part of the recent turnaround, a task force was formed with the objective to identify the root causes for such deviations and to investigate whether this operating mode posed any safety risk to the plant personnel and equipment. Furthermore, various operational issues encountered over the first years of operation will be covered in the paper. The reformer in particular performed differently than expected, and post combustion was taking place in the top of the reformer section; the side effect of this turned out to be quite significant for plant operation in general. With assistance from the licensor, the different observations were assessed and a plan was developed to address the deviations, both during the turnaround and during the subsequent start-up. The start-up after turnaround was carried out with assistance from the licensor. After start-up and subsequent trimming of the plant, optimal performance was achieved, and a plant capacity of 107% was demonstrated.
机译:尽管工厂能够达到设计能力,但在运行的最初几年中,它还是在偏离设计的条件下运行。作为最近的转变的一部分,成立了一个工作队,目的是找出造成这种偏差的根本原因,并调查这种工作模式是否对工厂人员和设备构成安全隐患。此外,本文还将介绍在运营的最初几年中遇到的各种运营问题。特别是重整器的性能与预期不同,后燃烧发生在重整器的顶部。事实证明,这样做的副作用对于整个工厂的运营而言是非常重要的。在许可方的协助下,评估了不同的观察结果,并制定了解决偏差的计划,无论是在周转期间还是在随后的启动期间。周转后的启动是在许可方的协助下进行的。在工厂启动和随后的修整之后,达到了最佳性能,并证明了工厂的产能为107%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号