1.A good plan begins with the end in mind for all affectedparties. The City benefited greatly by contracting with theCM early so they could work with the city and engineersduring design.2.Having the GMAX developed at 30-percent design achievedthe City’s goal to secure project funding early and gave themconfidence that the number was right.3.Frequent formal and informal communication is needed tokeep the design moving along to meet a tight schedule.4.The design engineers worked with the City & CM early toestablish the construction sequencing schedule, which drovedesign and bidding. Design items were prioritized to meetthe CM schedule.
机译:1,一个好的计划首先要考虑到所有受影响的人 派对。与纽约市签订合同,使纽约市受益匪浅 CM很早就可以与城市和工程师合作 在设计过程中。 2,实现了以30%的设计开发的GMAX 纽约市的目标是尽早获得项目资金并给予他们 相信这个数字是正确的。 3,需要经常的正式和非正式沟通 保持设计进度,以适应紧迫的进度。 4,设计工程师在早期就与City&CM合作 制定施工顺序表,从而推动 设计和招标。设计项目被优先考虑以满足 CM时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号