ADVANCES IN POWER PLANT STEAM BLOW CLEANING ANALYSES

机译:发电厂蒸汽吹扫分析的进展

获取原文
获取原文并翻译 | 示例

摘要

Steam blows are used prior to initial turbine powering for steam power plants to clear debris and surface scale that could potentially damage turbine blades during plant operation. Based on experience from steam blows for several dozen plants, enhancements have been made to the techniques in the detailed engineering analysis used by plant startup to perform steam blows. This paper discusses these improvements as applied to combined cycle gas and coal power plants. The basis for steam blows is that the piping is blown, bypassing the turbine, with sufficient boiler pressure to ensure that the piping will experience a dynamic pressure to assure adequate cleaning. Typically, the boiler pressures during steam blow provide a dynamic pressure throughout the piping, which is at least 20% higher than would be experienced for all plant operating conditions. Therefore, any potentially damaging particles will be blown out of the piping prior to the turbine operation. The following improvements and enhancements, which are detailed in this paper, have recently been implemented in the analyses used to establish adequate steam blows: 1. Advanced Modeling Techniques 2. Design Coordination with Fast Track Engineering 3. Consideration of Multiple HRSG Plants 4. Analysis Support During Actual Steam Blows (for site engineering and startup).
机译:在蒸汽轮机初次为涡轮机供电之前,使用蒸汽吹扫来清除可能在电厂运行期间损坏涡轮机叶片的碎屑和表面水垢。基于数十家工厂的蒸汽吹送经验,工厂启动时用于执行蒸汽吹送的详细工程分析中的技术已得到增强。本文讨论了应用于联合循环燃气和燃煤电厂的这些改进。吹汽的基础是,绕过涡轮机的管道是用足够的锅炉压力吹制的,以确保管道承受动压以确保充分清洁。通常,蒸汽吹送过程中的锅炉压力会在整个管道中提供动压,该动压比所有工厂运行条件下的动压至少高20%。因此,在涡轮机运行之前,任何可能损坏的颗粒都会从管道中吹出。本文中详细介绍了以下改进和增强功能,这些改进和增强功能最近已在用于建立足够蒸汽吹量的分析中进行了实施:1.先进的建模技术2.与快速通道工程的设计协调3.考虑多个HRSG工厂4.分析实际吹气期间的支持(用于现场工程和启动)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号