首页> 外文会议>AITES-ITA 2001 World Tunnel Congress Vol.3, Jun 10-13, 2001, Milan, Italy >'MEDIATION' - A PROPER TOOL FOR RISK ASSESSMENT IN TUNNELLING PROJECTS
【24h】

'MEDIATION' - A PROPER TOOL FOR RISK ASSESSMENT IN TUNNELLING PROJECTS

机译:“中介”-隧道项目风险评估的正确工具

获取原文
获取原文并翻译 | 示例

摘要

To arrive at a quantitative assessment of "risk", the "probability" as well as the "damage" of risk-relevant events must be determined as discrete figures. As the determination of the "damage" of an extraordinary event is possible by conventional cost and time evaluation, the "probability" at which such an event could happen can be gained by "mediation". This method of interdisciplinary consens finding was applied with success within risk assessment for 3 railway tunnels in Austria.
机译:为了对“风险”进行定量评估,必须将风险相关事件的“概率”以及“损害”确定为离散数字。由于可以通过常规的成本和时间评估确定异常事件的“损坏”,因此可以通过“调解”获得发生此类事件的“概率”。这种跨学科的共识发现方法已成功应用于奥地利3条铁路隧道的风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号