首页> 外文会议>AITES-ITA 2001 World Tunnel Congress Vol.1, Jun 10-13, 2001, Milan, Italy >NEW LAYOUT OF A1 FLORENCE-BOLOGNA HIGHWAY: INTEGRATED SEISMIC REFLECTION SURVEY AND TOMOGRAPHIC INVERSION TO PERFORM STRUCTURAL GEOLOGICAL MODELLING ALONG THE MAIN TUNNEL ROUTE
【24h】

NEW LAYOUT OF A1 FLORENCE-BOLOGNA HIGHWAY: INTEGRATED SEISMIC REFLECTION SURVEY AND TOMOGRAPHIC INVERSION TO PERFORM STRUCTURAL GEOLOGICAL MODELLING ALONG THE MAIN TUNNEL ROUTE

机译:A1佛罗伦萨-波洛尼亚高速公路的新布局:地震反射综合调查和层析成像反演,以沿主要隧道路线进行结构地质建模

获取原文
获取原文并翻译 | 示例

摘要

The Al highway between Firenze and Bologna comprises the construction of a new 8.5 km double tunnel in an area with complex geological setting. Subsequently an exploration program was settled to investigate this gap; the plan included several boreholes with wireline coring, seismic reflection profile along the layout, and cross-hole and surface to borehole tomographic surveys. The target of this study was focused on the southern side where a complex fault related transition between hard turbiditic sandstones and chaotic argillites is known to occur.
机译:佛罗伦萨和博洛尼亚之间的Al高速公路包括在地质条件复杂的地区建造一条新的8.5公里双隧道。随后制定了勘探计划以调查这一差距。该计划包括几个带有电缆取芯的钻孔,沿布局的地震反射剖面图以及跨孔和地表到孔层析成像调查。这项研究的目标集中在南侧,已知在硬混浊的砂岩和混沌的泥质岩之间会发生复杂的断层相关过渡。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号