首页> 外文会议>AITES-ITA 2001 World Tunnel Congress Vol.1, Jun 10-13, 2001, Milan, Italy >CONSTRUCTION OF A THIRD LANE ALONG THE A1 HIGHWAY ACROSS HILLY FLORENCE OUTSKIRTS: GEOPHYSICAL INVESTIGATION AT TUNNEL ROUTES
【24h】

CONSTRUCTION OF A THIRD LANE ALONG THE A1 HIGHWAY ACROSS HILLY FLORENCE OUTSKIRTS: GEOPHYSICAL INVESTIGATION AT TUNNEL ROUTES

机译:沿丘陵佛罗伦萨郊外的A1高速公路沿第三车道施工:隧道通道的地球物理调查

获取原文
获取原文并翻译 | 示例

摘要

The Al highway between Firenze South and Firenze North exits is undergoing a development project, based on the construction of a new third lane and an upgrading of highway interconnections. Moreover at Firenze Certosa exit, a new road with long tunnels is planned to bypass the Galluzzo village. Subsequently an exploration program was settled to investigate the tunnel routes, including boreholes with wireline coring, together with seismic refraction and reflection profiling. The seismic methods, with borehole calibration, were useful to achieve a geometrical reconstruction in a very complex geological environment.
机译:从Firenze South出口到Firenze North出口之间的Al高速公路正在进行一项开发项目,该项目的基础是新的第三车道的建设和公路互连的升级。此外,在Firenze Certosa出口处,计划修建一条长隧道的新路绕过Galluzzo村。随后确定了勘探计划,以研究隧道路线,包括带有电缆取芯的钻孔以及地震折射和反射剖面。带有井眼校准的地震方法对于在非常复杂的地质环境中实现几何重建非常有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号