FLARE MINIMIZATION STRATEGY DURING PLANT UPSETS: FREEPORT

机译:工厂备用期间的火炬最小化策略:自由港

获取原文
获取原文并翻译 | 示例

摘要

Dow owns and operates an E/P cracker in Freeport, Texas. The cracker was started up in the early 1970's and has a nameplate capacity of 1.3 billion 1bs/year ethylene. During plant startups, shutdowns, and off-spec incidents, hydrocarbon streams within the plant are diverted to the elevated flare. In 2001, a project utilizing Six Sigma methodology was initiated to minimize the amount of hydrocarbons flared during plant startups, shutdowns, and off-spec incidents, in order to reduce the impact to the environment and the local community. The reduction in hydrocarbons flared was achieved by minimizing startup/shutdown times, by utilizing existing recycle lines, and by maximizing recovery of products. Problems which occurred during previous startups and shutdowns were also identified and a plan for overcoming those problems was developed. From the start of the project in 2001 to the end of 2003, the project reduced emissions during startups, shutdowns, and off-spec incidents by 54% and resulted in a documented savings of $2.5 MM. The paper will describe the Six Sigma methodology used to execute the project and the strategies that were implemented in the plant.
机译:陶氏在得克萨斯州的弗里波特拥有并经营着E / P裂解装置。该裂解装置于1970年代初启动,铭牌上的乙烯产能为13亿1bs /年。在工厂启动,关闭和不合规格的事件期间,工厂内的碳氢化合物流会被转移到火炬高架上。 2001年,启动了一个使用六西格码方法的项目,以最大程度地减少工厂启动,关闭和不合格事件期间散发的碳氢化合物的数量,从而减少对环境和当地社区的影响。通过最小化启动/关闭时间,利用现有的回收生产线以及最大限度地提高产品的回收率,可以减少产生的碳氢化合物。还确定了先前启动和关闭期间发生的问题,并制定了解决这些问题的计划。从2001年的项目开始到2003年底,该项目将启动,关闭和不合格事件期间的排放减少了54%,并记录了2.5 MM的节省。本文将描述用于执行项目的六西格码方法论以及在工厂中实施的策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号