On March 17, 2003 Kaltim-4 Ammonia plant experienced an emergency shut down due to a high voltage power failure. The primary reformer unit tripped, but the flow of process air to HT Shift Converter (HTS) through the secondary reformer was not closed. This caused a temperature overrun in the HTS and damaged the catalyst Inspection of the HTS vessel showed a severe overheating. The catalyst was replaced and the vessel was operated for eight months at reduced operating conditions until a new vessel could be installed. On January 2004, the HTS vessel and catalyst were replaced and the plant is back to normal at 108% capacity.
机译:2003年3月17日,由于高压电源故障,Kaltim-4氨工厂紧急关闭。主重整器单元跳闸,但通过次重整器流向HT转换转换器(HTS)的工艺空气没有关闭。这导致HTS中的温度超限并损坏了催化剂。HTS容器的检查显示严重过热。更换催化剂,并将容器在降低的操作条件下运行八个月,直到可以安装新的容器为止。 2004年1月,更换了HTS容器和催化剂,该厂恢复了正常状态,产能为108%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号