Along the Adriatic coast, the Italian transmission system consists of a single 400 kV North-South Line. This limits the power transfer capacity between the Center North and Center South market zones and with the risk of overload in case of high renewable generation in Southern Italy. The year 2019 Network Development Plan foresaw the installation of a submarine High Voltage Direct Current (HVDC) line between the Fano (Center North) and Villanova (Center South) substations, in order to overcome environmental and social constrains and allow a full integration of Southern renewable sources. This paper presents an evaluation of the operating limits of a specific portion of the Adriatic 400 kV backbone, both in its current configuration and after the installation of the new HVDC link.
机译:在亚得里亚海沿岸,意大利的输电系统由一条400 kV南北线组成。这限制了中北部和中南部市场区域之间的电力传输能力,并且在意大利南部具有大量可再生能源的情况下,存在过载风险。 2019年的网络发展计划预见了在法诺(中北部)和维拉诺瓦(中南部)变电站之间安装海底高压直流(HVDC)线路,以克服环境和社会限制并允许南部地区的完全整合可再生资源。本文介绍了对Adriatic 400 kV主干网特定部分的运行极限的评估,包括其当前配置和安装新的HVDC链路后的情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号