首页> 外文会议>2019 AEIT HVDC International Conference >The restoration field tests in Sardinian network involving HVDC, synchronous condensers and hydraulic power plant
【24h】

The restoration field tests in Sardinian network involving HVDC, synchronous condensers and hydraulic power plant

机译:撒丁岛电网的高压直流,同步冷凝器和水力发电厂的恢复现场测试

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the studies performed by Italian TSO Terna, together with CESI, about feasibility of power system restoration strategies including HVDC links. The recent European Regulations ask for the design and implementation of proper restoration plans, considering all the generation, load capabilities and network characteristics. In the Italian power system, Sardinian network relies on several restoration paths. Indeed, the island is also connected to Italian peninsula through two HVDCs, SA.PE.I and SA.CO.I, the last of which is also a multi-terminal link connecting French island of Corsica. In light of this scenario, the paper firstly presents the outcomes of the preparatory investigations and later provides the results of five major restoration tests, performed between 2015 and 2017. Future trends in a context of continuous restoration plan update are also provided
机译:本文介绍了意大利TSO Terna和CESI一起进行的有关包括HVDC链路在内的电力系统恢复策略可行性的研究。考虑到所有发电,负载能力和网络特性,最近的欧洲法规要求设计和实施适当的恢复计划。在意大利的电力系统中,撒丁岛的网络依赖于几种恢复路径。实际上,该岛还通过两个HVDC(SA.PE.I和SA.CO.I)连接到意大利半岛,最后一个也是连接法国科西嘉岛的多端子链路。根据这种情况,本文首先介绍了准备性调查的结果,然后提供了2015年至2017年之间进行的五项主要恢复测试的结果。还提供了在持续恢复计划更新的背景下的未来趋势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号