首页> 外文会议>Advances in hydraulic physical modeling and field investigation technology. >Research on Monitoring Method for 3-Dimensional Deformation of Earth Rockfill Dam
【24h】

Research on Monitoring Method for 3-Dimensional Deformation of Earth Rockfill Dam

机译:土石坝三维变形监测方法研究

获取原文
获取原文并翻译 | 示例

摘要

The routine methods for monitoring deformation of surface of earth rockfill dam has several defectives, i. e., slow measurement speed, heavy workload, monitoring information can not share with automation system. High precision total station system (TCA2003) can provide solution for research and development of 3-dimensional automation measuring technology of earth rockfill dam, however, atmosphere refraction and other issues affect the measuring precision. In accordance with actual condition of Yanshan Reservoir, the paper analyzes the refraction coefficient, raises that grey relation modification model of atmosphere refraction. As per the actual engineering instance, it can be seen that the model can modify triangle elevation measuring value, afterwards that vertical displacement value can meet precision requirement on safety monitoring of earth rockfill dam.
机译:监测土石坝表面变形的常规方法有几个缺陷,即: e。测量速度慢,工作量大,监控信息无法与自动化系统共享。高精度全站仪系统(TCA2003)可以为土石坝三维自动化测量技术的研究和开发提供解决方案,但是,大气折射等问题都会影响测量精度。根据燕山水库的实际情况,对折光系数进行了分析,提出了大气折光的灰色关联修正模型。通过实际工程实例可以看出,该模型可以修改三角高程测量值,其竖向位移值可以满足土石坝安全监控的精度要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号