首页> 外文会议>Advanced Power System Automation and Protection (APAP), 2011 International Conference on >The analysis and corrective measures of common problems of 10 kV capacitor bank in substation
【24h】

The analysis and corrective measures of common problems of 10 kV capacitor bank in substation

机译:变电站10 kV电容器组常见问题的分析及纠正措施。

获取原文
获取原文并翻译 | 示例

摘要

In this paper, based on instances in substation, the common problems in the management of capacitor bank were analyzed. Moreover, the standard painting method of capacitor bank, the operation procedures and the safety measures of capacitor bank in substation was discussed. The solution to address these problems was proposed, which could provide a theoretical basis for the capacitor bank maintenance and the painting of electric primary system diagram in substation.
机译:本文基于变电站实例,分析了电容器组管理中的常见问题。此外,讨论了变电站电容器组的标准涂装方法,电容器组的操作步骤和安全措施。提出了解决这些问题的方法,可以为电容器组的维护和变电站电气一次系统图的绘制提供理论依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号