首页> 外文会议>Advanced manufacturing processes, systems, and technologies(AMPST 99) >Hybrid resource allocation problems - a laboratory case study
【24h】

Hybrid resource allocation problems - a laboratory case study

机译:混合资源分配问题-实验室案例研究

获取原文
获取原文并翻译 | 示例

摘要

The laboratory case study to be reported in this paper has been initiated by shipyard industry.Ship-building requires a large number of welding seems to be carried out by a relatively small number of co-operating automated robots.In the regular operation mode each robot is working with the same velocity.However,real world disturbances will cause varying velocities.Therefore rescheduling should be done such that one robot is used for assisting another one.A laboratory model of such a welding plant has been built up with two co-operating multi-link robots.
机译:本文所要报告的实验室案例研究是由造船业发起的,造船需要大量的焊接工作似乎是由相对较少的协作自动机器人进行的。在常规操作模式下,每个机器人虽然实际的干扰会导致速度变化,所以应该重新安排时间,以便使用一个机器人来辅助另一个机器人。已经建立了这样一个焊接工厂的实验室模型,其中两个合作多链接机器人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号