首页> 外文会议>Achievements collection of international symposium on Three Gorges Project and water resources development and protection of Yangtze River. >Environmental Considerations for Sustainable Hydropower Development in the Mekong Region-a Joint ADB, MRC and WWF Initiative
【24h】

Environmental Considerations for Sustainable Hydropower Development in the Mekong Region-a Joint ADB, MRC and WWF Initiative

机译:亚行,MRC和WWF联合倡议-湄公河地区水电可持续发展的环境考虑

获取原文
获取原文并翻译 | 示例

摘要

The significant hydroelectric potential of the Mekong and its tributaries remains largely untapped despite the various discussions in the past 40 years. To date, about 10% out of an estimated potential of 30,000 MW has been developed in the Lower Mekong Basin (LMB). Over the next 10—15 years, a significant proportion of this potential is likely to be realized. The opportunities and potential risks of such interventions have been well documented in past years. In response, the Asian Development Bank (ADB), Mekong River Commission (MRC) and World Wide Fund for Nature (WWF) started formulating a joint project on Environmental Considerations for Sustainable Hydropower Development (ECSHD) in 2006. The overall objective is to ensure that hydropower development in the Mekong Region is sustainable, which will require minimal adverse social and environmental impacts, while remaining a viable, profitable and source of renewable energy supporting the region's economic development. The aim of the ECSHD initiative is to develop a sustainability assessment tool for hydropower development that can be integrated into existing planning procedures and processes and move the input of sustainability considerations to earlier stages of the development cycle. The initiative will assist in energy master planning, water resources planning, economic development planning. Prominent examples of such tools are the Sustainability Guidelines and Sustainability Assessment Protocol of the International Hydropower Association (IHA). Development of ECSHD and its pilot testing will be closely coordinated with IHA's ongoing global process to improve their guidelines though a Hydropower Sustainability Assessment Forum with the ultimate goal of developing a uniform approach that incorporates issues specific to transboundary water resources projects and basin - wide assessments that can be integrated into country systems and processes, including Strategic Environmental Assessment.
机译:尽管过去40年来进行了各种讨论,但湄公河及其支流的巨大水电潜力仍未得到开发。迄今为止,在湄公河下游盆地(LMB)已开发出估计的30,000 MW潜力中的约10%。在接下来的10-15年中,很可能会实现这一潜力的很大一部分。过去几年中已充分记录了此类干预措施的机会和潜在风险。作为回应,亚洲开发银行(ADB),湄公河委员会(MRC)和世界自然基金会(WWF)于2006年开始制定一项关于环境因素以促进可持续水电开发(ECSHD)的联合项目。总体目标是确保湄公河区域的水电开发是可持续的,这将对社会和环境的不利影响降到最低,同时仍是支持该区域经济发展的可行,可盈利和可再生能源的来源。 ECSHD计划的目的是为水电开发开发可持续性评估工具,该工具可以集成到现有的规划程序和流程中,并将可持续性考虑因素的投入转移到开发周期的早期阶段。该计划将协助能源总体规划,水资源规划,经济发展规划。国际水电协会(IHA)的《可持续发展准则》和《可持续发展评估协议》就是此类工具的突出例子。通过水电可持续性评估论坛,ECSHD的开发及其试点测试将与IHA正在进行的全球流程密切配合,以改进其准则,其最终目标是制定统一的方法,纳入跨界水资源项目和流域范围评估的特定问题可以整合到国家系统和流程中,包括战略环境评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号