首页> 外文会议>9th AusIMM underground operator's conference 2005 >Excavation of the Lift 2 Crusher Hydroset Chamber and Orepassin Seismically Active Conditions at Northparkes Mines
【24h】

Excavation of the Lift 2 Crusher Hydroset Chamber and Orepassin Seismically Active Conditions at Northparkes Mines

机译:Northparkes矿山的2号提升机破碎机水固性箱的开挖和Orepassin地震活动条件

获取原文
获取原文并翻译 | 示例

摘要

Northparkes Mines is a joint venture between Rio Tinto and thernSumitomo group and is operated by Rio Tinto to produce copperrnconcentrate from ore sourced from open cut and underground.rnUnderground ore is mined with an owner operator workforce using thernblock cave method from the E26 deposit,with the first lift of the cavernnow completed.Development of the Lift 2 block cave commenced inrnMarch 2001 using a contract workforce.rnThe Lift 2 Project required the mining of 14 700 m of decline andrnlateral development to establish a ew mining horizon at the 9450 levelrnand to develop two new conveyor declines.rnAlso included in the scope was the excavation of a Crusher chamber tornhouse the jaw-gyratory crusher.rnThis paper describes the excavation of the hydroset chamber andrnorepass that sit immediately underneath the Lift 2 Crusher chamber.Itrnincludes risk assessment,planning,development of method statementsrnand standard operating procedures,through to the excavation of thernorepass and the installation of ground support in seismically activernground.rnThere was a major ground failure in the backs of the conveyor feederrnchamber during its excavation,which affected the excavation of thernorepass due to its proximity to the breakthrough site.
机译:Northparkes矿业公司是力拓(Rio Tinto)与thernSumitomo集团之间的合资企业,由力拓(Rio Tinto)运营,从露天矿和地下矿产铜精矿。rnn地下矿藏是由所有者操作人员使用E26矿床的rnblock洞穴法开采的,诺夫二号矿洞的第一个升降机已完成。2001年3月,使用合同工开发了勒夫二号矿洞。勒夫二号项目要求开采14700 m的下降矿山和侧向开发,以在9450层建立一个采矿视野。新的输送机下降装置。rn还包括对颚式旋转破碎机进行破碎的破碎机室的开挖。rn本文介绍了直接位于Lift 2破碎机室下面的液压固定室和rnorepass的开挖。它包括风险评估,规划,开发方法声明和标准操作程序的概述,直到挖洞输送机给料室的开挖过程中,后方发生了重大的地面故障,由于其靠近突破点而影响了热通道的开挖。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者

    J Nixon; A Weston;

  • 作者单位

    Senior Underground Supervisor,Lift 2 Project,Northparkes Mines,rnPO Box 995,Parkes NSW 2870;

    rnArgyle Diamonds,PrivaternMail Bag 11,West Perth WA 6872;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号