首页> 外文会议>9th AusIMM underground operator's conference 2005 >A Review - Pillar Stability Issues at DOZ Block Cave Mine
【24h】

A Review - Pillar Stability Issues at DOZ Block Cave Mine

机译:评论-DOZ Block Cave Mine的支柱稳定性问题

获取原文
获取原文并翻译 | 示例

摘要

PT Freeport's Deep Ore Zone (DOZ)Mine is the latest block cave minernwithin the East Ertsberg Skarn System (EESS).Issues with undercuttingrnand stress concentrations at the extraction level were experienced,leadingrnto reduced pillar strength.The extraction level-related issues becamernmore pronounced,leading to local panel drift collapse,in an area that wasrnover 100 per cent extraction.rnA review of ground conditions,panel collapse descriptions,and factorsrncontributing to panel collapse are presented in this paper.
机译:PT Freeport的深矿区(DOZ)矿是East Ertsberg Skarn系统(EESS)内最新的块状洞穴矿山。在开采水平上遇到了下陷和应力集中的问题,导致柱强度降低。与开采水平相关的问题变得更加明显,导致局部面板漂移塌陷,而这一区域的开采量超过了100%。本文介绍了地面条件,面板塌陷描述以及导致面板塌陷的因素。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者单位

    Cave Management Eng,PT Freeport Indonesia.rnE-mail:Amri_sinuhaji@fmi.com;

    rnCave Management Eng,PT Freeport Indonesia.rnE-mail:David_flint@fmi.com;

    rnCave Management Eng,PT Freeport Indonesia.E-mail:rnOkky_Rindriatmoko@fmi.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号