【24h】

Differential Cut-Off Grades

机译:差动截止等级

获取原文
获取原文并翻译 | 示例

摘要

Detailed underground mine design and optimisation studies undertakenrnby the author over the past few years have clearly demonstrated thatrnadditional value can be created by varying the cut-off grade (COG)rnspatially throughout a deposit as well as over time.This additional valuerncan be particularly significant for marginal operations.rnThis paper,by way of worked examples,illustrates the conceptual andrnpractical considerations of applying a differential cut-off policy for anrnunderground mine to both maximise value and manage risks associatedrnwith production and metal price volatility.Consideration is given to bothrnthe design stage of a new mine and to the strategic and practicalrnapplication of a differential cut-off policy in an operating mine.
机译:作者在过去的几年中进行的详细地下矿山设计和优化研究清楚地表明,通过在整个矿床中以及随时间变化空间上的边界品位(COG)可以创造附加价值。本文以工作实例为例,阐述了对地下矿山实行差异化停产政策以最大化价值并管理与生产和金属价格波动相关的风险的概念和实践考虑。新的矿山,以及在运营中的矿山中实施差异性停产政策的战略和实际应用。

著录项

  • 来源
  • 会议地点 Perth(AU)
  • 作者

    T P Horsley;

  • 作者单位

    AMC Consultants,Level 8,rn135 Wickham Terrace,Brisbane Qld 4000.rnE-mail:thorsley@amcconsultants.com.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号