【24h】

Technique of top coal caving with vibration

机译:振动放顶煤技术

获取原文
获取原文并翻译 | 示例

摘要

How to understand the top coal caving process and increase the top coal recovery ratio is one of the urgent problems to be resolved for the longwall top coal caving technology. The paper mainly studies a new theory and technique of top coal caving with vibration. The vibration device is mounted on the shield beam of the top coal caving support. The laboratory experiment and the numerical simulation were adopted in the study. The Distinct Element Method (DEM) numerical software (PFC2D) is used for the numerical simulation. Finally, the technique is applied to the 5209 top coal caving working face. Based on the experiment, the numerical simulation and the practice, the vibration can easily destroy the arch structure which is formed during the top coal caving process. The parameters about when the arch structure would be formed during the top coal caving process are obtained. The movement of the top coal caving process under the vibration condition makes a more stable layer uniform caving performance. The aim of the top coal caving with vibration technique, to increase the top coal recovery ratio and to lower the waste content rate, has been achieved.
机译:如何理解顶煤放顶过程,提高顶煤回收率,是长壁放顶煤技术亟待解决的问题之一。本文主要研究振动顶煤的新理论和新技术。振动装置安装在放顶煤支架的防护梁上。本研究采用实验室实验和数值模拟。使用离散元方法(DEM)数值软件(PFC2D)进行数值模拟。最后,将该技术应用于5209放顶煤工作面。根据实验,数值模拟和实践,该振动很容易破坏顶煤放顶过程中形成的拱形结构。获得了在顶煤放矿过程中何时形成拱形结构的参数。顶板放煤过程在振动条件下的运动使层状放煤性能更加稳定。达到了采用振动技术放顶煤,提高顶煤回收率,降低废品率的目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号