首页> 外文会议>5th International Symposium on HYDROMETALLURGY 2003 Vol.2: Electrometallurgy and Environmental Hydrometallurgy; Aug 24-27, 2003; Vancouver BC Canada >THE USE OF PB ISOTOPES, TOTAL METALS ANALYSIS AND TOTAL METALS RATIOS TO CHARACTERIZE PB TRANSPORT AND FATE IN AN INTERRUPTED STREAM, ARAVAIPA CREEK, SE ARIZONA
【24h】

THE USE OF PB ISOTOPES, TOTAL METALS ANALYSIS AND TOTAL METALS RATIOS TO CHARACTERIZE PB TRANSPORT AND FATE IN AN INTERRUPTED STREAM, ARAVAIPA CREEK, SE ARIZONA

机译:利用苯同位素,总金属分析和总金属比来表征塞拉里奥纳阿拉瓦帕克里克的间断性流中的铅运输和命运

获取原文
获取原文并翻译 | 示例

摘要

The most probable source of Pb contamination in the perennial reach of Aravaipa Creek, Arizona, has been determined using Pb isotope ratios and total metals analyses of samples collected from the ephemeral and perennial reaches and mine wastes located in the Aravaipa Mining District. Previously, elevated levels of Pb, Cd and As in fish in the perennial reach of Aravaipa Creek, a protected wilderness area,, were assumed to be due to off-site transport from abandoned flotation tailings piles located at Klondyke, Arizona upstream of the wilderness area. Our work replaces this inference with isotopic data that allows us to confirm this hypothesis. The Pb/Zn deposits of the district were mined between the late 1890s and the late 1960s, with the most significant ore production coming from one deposit in a rhyolite dike swarm on the Western front of the Santa Teresa Mountains, a granitic pluton of Cretaceous-Tertiary age (~65 ma). Mineralogy has been well constrained across the length of the lode system: Pb and Zn sulfides predominate in the NW sector, and a mixed suite of hypogene/supergene Pb sulfide and Pb oxide minerals comprises the majority of its SE corner. Total metals analyses and comparison of metals ratios serve to constrain the source and transport of certain metals within different parts of the system. Pb isotope ratios in samples, obtained by ICP-MS analysis, define two distinct contributors. The first end-member (~(208)Pb/~(204)Pb = 38.513 to 38.721 and ~(207)Pb/~(204)Pb = 15.550 to 15.598) is characteristic of the mixed, oxide/sulfide ores at the SE end of the deposit. A second end-member (~(208)Pb/~(204)Pb = 38.855 to 38.946 and ~(207)Pb/~(204)Pb = 15.610 to 15.625) characterizes samples taken from the NW, purely Pb sulfide end of the lode. Pb isotope ratios from perennial reach sediments are closely correlated with ratios given by samples from the Klondyke tailings site and by Pb sulfide samples from the NW sector, the primary source of ores processed at Klondyke.
机译:亚利桑那州Aravaipa Creek多年生河段最可能的Pb污染源是使用Pb同位素比以及对从Aravaipa矿区的短暂和多年生河段以及矿山废物中收集的样品进行的总金属分析确定的。以前,人们认为,受保护的荒野地区Aravaipa Creek常年到达的鱼类中Pb,Cd和As的水平升高是由于荒野上游亚利桑那州Klondyke的废弃浮选尾矿堆的异地运输造成的区域。我们的工作用同位素数据代替了这一推论,从而使我们能够证实这一假设。该地区的Pb / Zn矿床在1890年代末至1960年代末期开采,其中最大的矿石产量来自圣特雷莎山脉西部前缘的流纹岩堤坝群中的一个矿床,这是白垩纪-白垩纪的花岗岩体。大专年龄(〜65 ma)。矿物学在整个矿床系统的长度上都受到严格限制:在西北地区,Pb和Zn硫化物占主导地位,其次生角/表生型Pb硫化物和Pb氧化物混合矿物构成了其东南角的大部分。全金属分析和金属比例比较可限制某些金属在系统不同部分中的来源和运输。通过ICP-MS分析获得的样品中铅同位素比率定义了两个不同的因素。第一个端部成员(〜(208)Pb /〜(204)Pb = 38.513至38.721和〜(207)Pb /〜(204)Pb = 15.550至15.598)是混合氧化物/硫化物矿石的特征。 SE存款的末尾。第二个末端成员(〜(208)Pb /〜(204)Pb = 38.855至38.946和〜(207)Pb /〜(204)Pb = 15.610至15.625)表征了取自NW的纯Pb硫化物末端的样品该矿。多年生河床沉积物中的铅同位素比率与克朗代克尾矿站点的样品和西北地区(克朗代克加工矿石的主要来源)的硫化铅样品给出的比率密切相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号