首页> 外文会议>The 5th International Symposium on Cement and Concrete Vol.3 Oct 28-Nov 1, 2002 Shanghai, China >APPLICATION OF TURNOVER FORM IN THE INTAKE WORKS OF TGP UNDERGROUND POWER STATION
【24h】

APPLICATION OF TURNOVER FORM IN THE INTAKE WORKS OF TGP UNDERGROUND POWER STATION

机译:周转形式在三峡地下电站进场工程中的应用

获取原文
获取原文并翻译 | 示例

摘要

The visual quality of concrete placement at the ogee location in the construction of water resources and hydropower projects has been one of the difficulties affecting the project quality. To ensure the visual quality of concrete to meet the design and operation, improvement must be made to the techniques and technologies. A new process is presented in the paper by means of application of the method of turnover form construction in the intake works of the TGP right bank underground power station and effective improvement to the visual quality, which facilitates the construction of hydropower projects in the fuature.
机译:在水利水电项目建设中,在大地位置混凝土浇筑的视觉质量一直是影响项目质量的难题之一。为了确保混凝土的外观质量满足设计和操作要求,必须对技术进行改进。通过在三峡右岸地下电站取水工程中采用周转形式施工方法,有效改善视觉质量,提出了一种新的工艺流程,为今后的水电工程建设提供了方便。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号