首页> 外文会议>5th IET International Conference on Renewable Power Generation 2016 >Putting the IET code of practice for grid connected solar photovoltaic systems into practice
【24h】

Putting the IET code of practice for grid connected solar photovoltaic systems into practice

机译:将并网太阳能光伏系统的IET作业规范付诸实践

获取原文
获取原文并翻译 | 示例

摘要

Published in 2015, the IET Code of Practice for Grid Connected Solar Photovoltaic Systems (IET Solar PV CoP) [1] was developed by the IET and a committee of solar industry experts to provide a measure of confidence that solar photovoltaic (PV) systems of all scales are competently, safely and effectively installed. Previous UK documents only addressed systems up to 50kW capacity, implying that over half the UK's PV capacity has been installed without any frame of reference linking to relevant UK and international standards and current good practice guidance. This paper discusses the requirements of the IET Solar PV CoP in the context of previous UK technical guidance for solar design and installation, how these best practices should be implemented and the value that they bring to a solar project.
机译:由IET和太阳能行业专家委员会共同制定的IET并网太阳能光伏系统操作规范(IET Solar PV CoP)[1]于2015年发布,目的是衡量人们对太阳能光伏系统的信心。所有秤都可以胜任,安全且有效地安装。英国以前的文件仅针对容量高达50kW的系统,这意味着英国已安装了超过一半的光伏发电容量,而没有任何参考框架与相关的英国和国际标准以及当前的良好实践指南联系在一起。本文在先前英国关于太阳能设计和安装的技术指南的背景下,讨论了IET太阳能光伏CoP的要求,如何实施这些最佳实践以及它们为太阳能项目带来的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号