首页> 外文会议>59th highway geology symposium : Proceedings >NEW MEXICO'S RAIL RUNNER EXPRESS PHASE II:GEOLOGIC OVERVIEW AND GEOTECHNICAL EVALUATION OF THE MANCOS SHALE
【24h】

NEW MEXICO'S RAIL RUNNER EXPRESS PHASE II:GEOLOGIC OVERVIEW AND GEOTECHNICAL EVALUATION OF THE MANCOS SHALE

机译:新墨西哥州的铁路运营商第二阶段:MANCOS页岩的地质概况和岩土工程评价

获取原文
获取原文并翻译 | 示例

摘要

New Mexico's Rail Runner Express is a commuter rail line that after completion of Phase II will connect the city of Belen, Albuquerque, and the state capital-Santa Fe. To make the connection from Bernalillo to Santa Fe a notable distance of 17 miles of new track is currently under construction. To meet the project completion target of December 2008 a design-build delivery method is being utilized.rnThe Rail Runner project resides in North-Central New Mexico, an active and diverse geologic setting with a rich mining history. The project site is in the Rio Grande Rift, passes through the Cerros del Rio volcanic field, and immediately adjacent to Cerrillos Hills, a mined out laccolithic intrusion. The preliminary geotechnical investigation encountered geologic units that include Cretaceous shales, basalt lava flows, Quaternary basin fills, and recent alluvium.rnThe new track alignment requires 7 new bridges, 5 concrete boxes over/under pass structures, and numerous retaining walls to be constructed. Two of the concrete box structures bring the rail in and out of the 1-25 highway median. A noteworthy portion of the alignment is where the new track will climb the La Bajada escarpment through Waldo Canyon, this area was avoided by historic rail alignments and requires construction of deep cuts and fills. In this area the Mancos Shale is prevalent and is known to be a highly degradable. Due to concerns with the quality of the Mancos Shale as a "soil" or "rock" material preliminary design considerations disallowed its use as a fill material.
机译:新墨西哥州的Rail Runner Express是一条通勤铁路线,第二阶段完成后将连接Belen市,Albuquerque和州首府Santa Fe。为了使贝尔纳里洛(Bernalillo)到圣达菲(Santa Fe)的连接,目前正在建设新的17英里长的赛道。为了实现2008年12月的项目完成目标,正在采用一种设计-建造交付方式。rnRail Runner项目位于新墨西哥州中北部,这是一个活跃而多样的地质背景,具有丰富的采矿历史。该项目的地点在里奥格兰德大裂谷,穿过塞罗斯德尔里约火山场,并紧邻塞里洛斯山,这是一个开采出的石器时代的侵入岩。初步的岩土工程研究遇到的地质单元包括白垩纪页岩,玄武岩熔岩流,第四纪盆地充填物和最近的冲积层。新的轨道调整需要7座新桥,5座过/下通过结构的混凝土箱以及大量的挡土墙。其中两个混凝土箱形结构可将轨道带入和带出1-25高速公路中线。路线的一个值得注意的部分是新轨道将沿着瓦尔多峡谷攀登La Bajada悬崖,该地区由于历史悠久的铁路路线而无法使用,需要进行深挖和填筑。在这个地区,Mancos页岩很普遍,并且已知其降解性很高。由于担心Mancos页岩作为“土壤”或“岩石”材料的质量,初步设计考虑不允许将其用作填充材料。

著录项

  • 来源
  • 会议地点 Santa Fe NM(US);Santa Fe NM(US);Santa Fe NM(US)
  • 作者

    TIMOTHY; D. THOMAS;

  • 作者单位

    Gannett Fleming West, Inc 2155 Louisiana NE, Suite 7000,Albuquerque, NM 87110;

    New Mexico Department of Transportation 1120 Cerrillos Road, P.O. Box 1149, Santa Fe, NM 87504-1149;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 道路工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号