Sensor response time is an important factor in the control loop performance. For steam temperature control in a fossil steam power plant, the temperature measurement at the desuperheater outlet location should be fast to improve the loop disturbance rejection performance. Previous work studied the impact of thermocouple and thermowell design on response time. In this paper, a new thermocouple and thermowell were installed in the boiler and response tested to verify the predicted values. In addition the old thermowell which was removed was inspected and tested in a laboratory environment in the as-found condition and in a clean condition. The closed loop performance of the steam temperature after installation of the new equipment is also presented.
机译:传感器响应时间是控制回路性能的重要因素。对于化石蒸汽发电厂中的蒸汽温度控制,减温器出口位置的温度测量应快速进行,以提高环路干扰抑制性能。先前的工作研究了热电偶和热套管设计对响应时间的影响。在本文中,在锅炉中安装了新的热电偶和热电偶套管,并对其响应进行了测试以验证预测值。另外,在实验室环境中以原样状态和清洁状态检查并测试了拆下的旧热电偶套管。还介绍了新设备安装后蒸汽温度的闭环性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号