【24h】

Fzzy process model development with missing data

机译:缺少数据的模糊过程模型开发

获取原文
获取原文并翻译 | 示例

摘要

The research has developed a fuzzy logic approach to handling missing data. A prototype fuzzy model was developed, using the FuzzyTech software, to assess the quality of the steel production in tems of composition, time, and temperature. As tools like FuzzyTech are not able to handle missing data, the research has introduced a fuzzy logic approach to decision making with less data. A number of workshops were carried out in the plant, and the aired experts's knowledge was the basis for the research's development. This paper will present the state of the art research on the application of artificial intelligenece and statistical techniques for handling the missing data problem.
机译:该研究已经开发出一种模糊逻辑方法来处理丢失的数据。使用FuzzyTech软件开发了原型模糊模型,以评估成分,时间和温度等方面的钢铁生产质量。由于诸如FuzzyTech之类的工具无法处理丢失的数据,因此该研究引入了一种模糊逻辑方法来进行数据较少的决策。该工厂举办了许多研讨会,经过宣讲的专家的知识是这项研究发展的基础。本文将介绍有关应用人工智能和统计技术处理缺失数据问题的最新技术研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号