【24h】

DECOMMISSIONING OF THE ICI TRIGA MARK I REACTOR

机译:ICI TRIGA MARK I反应器的退役

获取原文
获取原文并翻译 | 示例

摘要

This paper considers the fuel removal, transportation and subsequent decommissioning of the ICI Triga Mark I Reactor at Billingham, UK. This work was carried out on behalf of ICI by BNFL Waste Management and Decommissioning. The decommissioning methodology was considered in the four stages to be described; namely Preparatory Works, Reactor Defuelling, Intermediate Level Waste Removal and Low Level Waste Removal. This paper describes the principal methodologies involved in the defuelling of the reactor and subsequent decommissioning operations, highlighting in particular the design and safety case methodologies used in order to achieve a solution which was completed without incident or accident and resulted in a cumulative radiation dose to personnel of only 1.57mSv.
机译:本文考虑了英国比灵汉的ICI Triga Mark I反应堆的燃料去除,运输和后续退役。这项工作是由BNFL废物管理和退役代表ICI进行的。在将要描述的四个阶段中考虑了退役方法。即准备工作,反应堆加油,中级废物清除和低级废物清除。本文介绍了反应堆除油和随后的退役操作所涉及的主要方法,特别强调了用于实现解决方案的设计和安全案例方法,该解决方案没有发生事故或意外事故,并且向人员造成了累积辐射剂量仅1.57mSv。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号